Puerto Rico - Excise Tax Exemption for Farmers

In Puerto Rico, "bona fide farmers" are exempted from paying sales and use tax on equipment, devices, and objects that operate solely on solar, wind, hydro, or any other type of power, excluding the power from petroleum and its derivatives. A farmer must be certified by the Department of Agriculture to be considered a "bona fide farmer" or "bona fide agricultural business." This exemption is part of a larger tax package aimed at supporting Puerto Rican farmers.

Last Update

Puerto Rico - Property Tax Exemption for Solar and Renewable Energy Equipment

Puerto Rico provides a property tax exemption for all "solar powered material, equipment or accessory and renewable energy collection, storage, generation, distribution, and application equipment."  Renewable energy is defined per Ley 325-2004: solar, wind, hydro, biomass, ocean thermal, wave, tidal and other energy "whose use is clean, reliable, safe and sustainable."

Last Update

City of Lompoc Utilities - PV Rebate Program

City of Lompoc Utilities provides rebates to its electric customers who purchase and install photovoltaic (PV) systems. The rebate is $1.00 per watt-AC. The incentive amount may not exceed 50% the cost of the system, up to a maximum of $50,000.

To qualify for the rebate the system must meet all the criteria as defined by the Lompoc City Electric interconnection agreement for self-generating electric systems and the requirements set forth by the California Energy Commission.

Last Update

Madison Gas & Electric - Clean Power Partner Solar Buyback Program

The Clean Power Partners Program has reached the 1 MW cap. Applicants can be placed on a waiting list or participate in MGE's net metering program.

Customer-generators enrolled in the Madison Gas & Electric (MGE) green power purchase program (Green Power Tomorrow) are eligible to receive a special rate for the power produced from solar photovoltaic (PV) systems. Under this program, the electricity produced from 1 to 10 kilowatt (kW-DC) PV systems will be purchased by MGE at a rate of $0.25/kilowatt-hour (kWh). This rate will apply to all electricity produced by the system. As the program

Last Update

Richland Energy Services - Residential Energy Efficiency Rebate Program

Richland Energy Services (RES) provides a number of rebates encouraging energy efficiency for its residential customers.  Rebates exist for Energy Star home appliances, HVAC equipment and improvements, and also window and insulation upgrades.  Rebates for insulation upgrades vary according to the prexisting insulation levels present in a home. All work must be performed by an approved contractor to qualify for rebates. For further information or any questions, please visit the program website listed above or contact RES directly.
 

Last Update

Harford County - Property Tax Credit for Solar and Geothermal Devices

Harford County offers a tax credit from real property taxes imposed on residential buildings, nonresidential buildings, or other structures that use solar or geothermal devices for heating, cooling, water heating or generating electricity for on-site consumption. The credit amount is equal to one year of total real property taxes or $2,500 per device, whichever is less. In September 2010 the county added a provision limiting total credits to $5,000 per property per fiscal year. Total real property taxes include all real property taxes that would have been paid by the taxpayer for that year for the host building or structure

Last Update

City of Grand Rapids - Green Power Purchasing Policy

The City of Grand Rapids began their sustainability journey around 2005. In 2019, they published a strategic plan to serve as a framework for all operations. In 2023 they created a Climate Action & Adaptation Plan to prepare for the impacts of climate change. See the website for additional details.

Last Update

City of Grand Rapids - Green Building Requirements for Municipal Buildings

In January 2006, the City of Grand Rapids approved a resolution detailing the city's sustainability policy for public buildings. The resolution directed city personnel to implement the principles for the U.S. Green Building Council's LEED program and the EPA Energy Star and Green Lights programs. Included in this was a specific requirement that all construction and renovation projects involving municipal buildings larger than 10,000 square feet and a cost of $1 million or more receive LEED certification.

Update: Grand Rapids' 2019 strategic plan established goals for renewables, emissions reductions, and energy reductions for public buildings, as well as percentage increases

Last Update

Rural Electric Cooperatives Energy Efficiency Rebate Programs (Offered by 12 Utilities)

The Central Iowa Power Cooperative (CIPCO) is a generation and transmission cooperative serving 12 rural electric cooperatives (REC) and one municipal electric cooperative in the state of Iowa. They are:
 
  • Clarke Electric Cooperative 
  • Consumers Energy Cooperative 
  • East-Central Iowa REC 
  • Eastern Iowa Light and Power Cooperative
  • Farmers Electric Cooperative
  • Guthrie REC
  • Linn County REC
  • Maquoketa Valley Electric Cooperative
  • Midland Power Cooperative 
  • Pella Cooperative Electric Association 
  • Southwest Iowa REC 
  • T.I.P. REC
  • South Iowa Municipal Electric Cooperative Association (SIMECA)

CIPCOs’ members serve a population of nearly 320,000 rural and urban residents in 58 of Iowa’s 99 counties. Each has established energy efficiency
Last Update

New York City - Green Building Requirements for Municipal Buildings

In 2005 New York City passed a law (Local Law No. 86) making a variety of green building and energy efficiency requirements for municipal buildings and other projects funded with money from the city treasury. The building requirements (described in detail below) apply to new construction, building additions, and substantial reconstructions of existing buildings. Substantial reconstruction is defined as a capital project that involves construction work affecting at least 50% of the floor area or that involves rehabilitation work in at least two of the three major building systems (HVAC, electrical, plumbing). The construction cost values below are

Last Update
Subscribe to