Solar Photovoltaics

Advanced Energy Gross Receipts Tax Deduction

New Mexico has a gross receipts tax structure for businesses instead of a sales tax. Businesses are taxed on the gross amount of their business receipts each year before expenses are deducted. Revenue generated by the sale and installation of a "qualified generating facility" may be deducted from gross receipts before the gross receipts tax is calculated. The deductions are allowed for a 10-year period starting the year construction begins. Qualified generating facilities have a minimum nameplate capacity of 1 megawatt (MW) and include geothermal thermal electric, photovoltaic, solar thermal electric, and recycled energy systems. Solar facilities with associated renewable

Last Update

River Falls Municipal Utilities - Renewable Energy Finance Program

River Falls Municipal Utilities (RFMU) offers loans of $2,500 - $50,000 to its residential customers for the installation of photovoltaic (PV), solar thermal, geothermal, wind electric systems. The program will also support the installation of energy efficiency measures in connection with a qualifying renewable energy project, provided that the renewable energy portion of the project comprises at least 50% of project costs. Systems that generate renewable electricity must be connected to the RFMU distribution grid. Loan terms vary by project, but may range from 5 -20 years at a current interest rate of 4%. Actual loan terms will be determined

Last Update

Assessment of Farmland Hosting Renewable Energy Systems

In New Jersey, under the Farmland Assessment Act, farmland actively devoted to an agricultural or horticultural use is assessed at its productivity value. This practice generally results in a lower tax burden for farmland owners compared to residential or commercial land owners. In January 2010 New Jersey enacted legislation (S.B. 1538), which among other things clarifies how farmland used for biomass, solar, and wind energy generation should be treated under the Farmland Assessment Act. Ultimately, the law states that the addition of a biomass, solar, or wind energy generating system to land that was assessed and taxed as

Last Update

Solar Energy Option Requirement for Residential Developments

In March 2009 New Jersey enacted legislation (A.B. 1558) designed to support the integration of solar energy systems into new residential developments. The law requires that developers of residential developments with 25 or more dwelling units must "offer to install, or to provide for installation of, a solar energy system" when techinically feasible.

 Solar energy systems are defined to include systems that use solar energy to provide "all or a portion of the heating, cooling, or general energy needs of a dwelling unit, including, but not limited to, nocturnal heat radiation, flat plate or focusing solar collectors, or

Last Update

U.S. Virgin Islands - Renewables Portfolio Targets

Eligible Technologies

Photovoltaic Energy, wind energy, hydroelectric energy, landfill gas, biomass, ocean and microturbine systems.

Requirements

In July 2009, the Virgin Islands (USVI) passed Act 7075. Among other provisions, the legislation establishes that the "peak demanded generating capacity" of the Virgin Islands Water and Power Authority* must be from renewables according to the following schedule:

  • 20% by January 1, 2015
  • 25% by January 1, 2020
  • 30% by January 1, 2025

It further establishes that a "majority" of this generating capacity must come from renewables or alternative technologies beyond 2025. Joint rulemaking is to be undertaken by the Virgin Islands Energy

Last Update

City of Philadelphia - Green Power Purchasing

Philadelphia Municipal Energy Master Plan for the Built Environment

The plan outlines how City government will reach these goals by reducing energy use and cleaning the energy supply. Because energy plays an important role in climate change and disaster preparedness, the plan also informs City government’s climate mitigation and adaptation work. To read the plan visit here.

This plan provides City-owned buildings a roadmap for:

  • Increased energy efficiency.
  • Renewable energy generation.
  • Energy resiliency in municipal buildings and the built environment in Philadelphia

The plan sets four goals for City government’s owned and operated built environment:

  • Reduce greenhouse gas emissions
Last Update

Gross Receipts Tax Exemption for Sales of Wind and Solar Systems to Government Entities

New Mexico has a gross receipts tax structure for businesses instead of a sales tax. Businesses are taxed on the gross amount of their business receipts each year before expenses are deducted. Receipts associated with the sale of certain wind turbine equipment to federal, state, or local government entities are exempt from being added to gross receipts. S.B. 201, signed in March 2010, extended this exemption to solar thermal electric and photovoltaic systems sold to a government on or after July 1, 2010.

Last Update

Energy Efficiency Loans for State Government Agencies

Through the Green Bank of Kentucky, executive branch state agencies may be eligible for three separate energy loan products, depending on the proposed energy conservation improvements. Prior to applying, all agencies are required to submit an energy survey (available on the Green Bank's web site). The Green Bank will then forward the loan application packet (including information regarding the additional required documentation) for the agency to complete and submit. All application letters must be signed by the agency head.

Initial funding for the Green Bank of Kentucky provided by the American Recovery and Reinvestment Act (ARRA) through the Kentucky State

Last Update

South Dakota Solar and Wind Easement Law

Any South Dakota property owner may grant a solar* or wind easement with the same effect as a conveyance of an interest in real property. Easements must be established in writing, and must be filed, recorded and indexed in the office of the register of deeds of the county in which they are granted. The maximum term of an easement is 50 years. Any payments associated with an easement must be made on an annual basis to the owner of the real property. No wind or solar easement or wind or solar lease may be executed by the parties until

Last Update

Austin Energy - Commercial Solar PV Incentive Program

Austin Energy offers two incentives on the installation of a solar photovoltaic (PV) system to customers with a commercial Austin Energy account number. The first program is a performance-based incentive (PBI) which provides a credit on your business' bill for the power your solar PV system generates. The second is a capacity-based incentive, offering customers an up-front check for installed solar PV capacity.

The incentive rate varies based on capacity of the program, though PV systems shall not be sized to produce more than 110% of the historical annual energy consumption of the connected load. In order to qualify for

Last Update