Mississippi Rebates and Incentives Summary

MississippiBefore you compare quotes in Mississippi, find out who sells you electricity. It matters more here than in almost any other state, because the state's net metering rule does not reach most of the map. The Mississippi Public Service Commission's rule binds the two investor-owned utilities, Entergy Mississippi and Mississippi Power. It does not bind the cooperatives or the TVA distributors, and that is not a technicality: Cooperative Energy supplies 11 distribution cooperatives serving roughly 437,000 customers across 55 of Mississippi's 82 counties, and TVA reaches another 14 municipal and 14 cooperative utilities across the northern half of the state.

The difference shows up directly in what your surplus kilowatt-hours are worth. Under the Commission's rule, an investor-owned utility pays its avoided energy cost plus a Distributed Generation Benefits Adder of 2.5 cents per kWh, with a further Low-Income Benefits Adder for qualifying households. Cooperative Energy files the annual report the rule requires but, in the Commission's own words, "does not incorporate the 2.5 cents/kWh benefits adder" into what it pays. TVA pays its avoided cost rate alone, published monthly, which the Commission recorded at 1.783 cents per kWh for May 2023. Same panels, same sunshine, and an export credit that can differ several-fold depending on which side of a service-territory line your roof sits.

So the first question to put to an installer is not what the system costs but which rate schedule you will be placed on. For Entergy Mississippi that is Rate Schedule NEM-2, approved 16 March 2023; for Mississippi Power it is Option A under Rate Schedule RENM-1A, approved 21 September 2022. Ask for the current adder values in writing, because the Commission has revised this rule repeatedly: it opened docket 2012-AD-19 in January 2021 to review the rule's fairness, approved amendments on 12 July 2022, granted the two utilities a rehearing after they moved to rescind, and issued the final Post-Rehearing Order on 4 October 2022. Those 2022 rules also directed the utilities to file separately for Solar-for-Schools programs and for up-front rebates on distributed generation, so ask whether an up-front rebate is currently approved and funded on your utility's schedule rather than assuming one advertised elsewhere still exists.

A few mechanics catch people out. Entergy treats anything at or below 20 kW as a Level 1 interconnection, and a Level 1 system may not be sized to offset more than 110 percent of your own prior-year consumption at that location, so a large array on a low-usage house will be refused rather than trimmed. Entergy also charges a one-time, non-refundable interconnection fee of $95 with an AMI meter or $135 without, credits surplus to the next billing cycle, and refunds accumulated credit only when you close the account. Notably, Entergy requires panels to be roof-mounted and interconnected behind the meter; ground mounts do not qualify. Mississippi Power, separately, may refuse applications once total net metering capacity passes 3.0 percent of its system peak demand. Check the interconnection standards before you design around a particular layout.

For perspective on how early this market still is: as of 31 December 2022 the Commission counted 1,416 solar distributed generation customers statewide with about 27.7 MW installed in total, and for every utility that was under 0.3 percent of peak system demand. Mississippi has no renewable portfolio standard to push that number, so the money comes from utility programs rather than from a state mandate. Worth checking: the low-to-moderate income residential offerings from Entergy Mississippi and Mississippi Power, Mississippi Power's battery storage incentive and residential loan program, Entergy's demand response battery program, and, in TVA territory, TVA Green Power Providers. The Mississippi Clean Energy Initiative covers the manufacturing side.

Finally, the federal arithmetic changed. The 30 percent residential clean energy credit under Section 25D was terminated for expenditures made after 31 December 2025, so it no longer offsets a Mississippi installation. With no state credit to fall back on, the case now rests on your utility's export rate, any approved up-front rebate, efficiency work through Entergy or Mississippi Power, and financing. See our federal credit page, the rest of the federal programs, and the Mississippi solar installers directory.

Verified 22 November 2026 against the Mississippi Public Service Commission's published updates from the Central District Office (May 2023), which carry the utility-by-utility compensation terms, the adoption figures as of 31 December 2022 and the docket history, and against Entergy Mississippi's own net metering program page for interconnection levels, fees and sizing. Adder values and rebate availability are set in utility rate schedules and change; confirm current figures with your utility.