Xcel Energy offers Energy Design Assistance (EDA) to qualified Colorado business customers. EDA gives customers a comprehensive approach to energy and cost savings for businesses considering new construction or renovation projects. EDA services can be tailored to the unique needs of each business. Featured services include: energy consulting services and predictive energy modeling, free to participants; enhanced services, including help toward a green building certification and early analyses in areas such as daylighting, lighting, massing, and heating, ventilation and air conditioning (HVAC); construction rebates for a package of whole building energy opportunities from envelope, lighting, and cooling to unique opportunities
Southern California Edison (SCE) offers a variety of financial and technical assistance for commercial and industrial customers, including energy audits and assessments, rebates for efficiency upgrades, participatory demand-response programs, and assistance for distributed generation energy systems. All business customers are eligible (i.e., all non-residential customers).
The Solar Energy Program (SEP) program offers financial assistance as loans to eligible applicants to promote manufacturing, research and development, and generation of solar energy in the state. The program is administered jointly by the Department of Community and Economic Development (DCED) and the Department of Environmental Protection (DEP) under direction of the Commonwealth Financing Authority (CFA).
Eligibility
The following applicants are eligible for loans:State of Alabama provides the option for local governments to provide exemptions or abatement for sales and use tax for qualifying renewable energy facilities in the State. The state has a general sales tax of 4%, however, the renewable energy facilities qualify for 1.5% rate provision that is set for manufacturing and farm machinery. In addition to State sales tax, the local governments may also impose an additional sales or use tax.
The exemption or abatement for both state and local sales/use tax are provided by the local granting authority. The local granting authority could be a city, county, or
Solar Installation plans, specifications and other data shall be submitted for permit to the Building Official. The fees for solar installation are as follows, $40 for two or less site inspection for final approval and $15 for each additional site inspection. The Energy Advisory Board acts as a board of appeals for the solar installation process. Specific certificates and licenses are required to install, repair, replace and alter solar energy systems and it is unlawful to do so without a certificate or license.
2023 Update
Wichita-Sedgwick County government is currently reviewing the permitting process for Solar Energy Systems. The current
Pima County has outlined its solar and wind permitting standards. The general requirements include a site plan and cut sheets for all system equipment. For solar photovoltaic (PV) systems a one line diagram with conductor and conduit sizes and types must be included. Click here for more information on solar PV system requirements. Solar hot water systems require a solar hot water schematic which includes the temperature relief valve. Wind energy systems are allowed one tower per residential lot.
It should be noted that depending on the project scope, your application may require prior approval from Regional Flood Control District
Under Miami-Dade's current permitting process PV projects may be permitted by submitting required documents through the Miami-Dade Department of Regulatory and Economic Resources Plan Status and Application Submittal Portal.
Applicants seeking a permit for a solar PV system in Miami-Dade are required to submit the following items at the time of permit application:
The purpose of this policy is to help define appropriate locations for solar energy systems, to ensure compatibility with surrounding uses, and to promote safe and effective use of solar energy to increase opportunities for renewable energy generation.
In general, solar energy systems are allowed in all zoning districts. Solar energy system must comply with the minimum yard requirements of the district where they are located. Screening of solar energy systems is not required. All lots in subdivisions of forty (40) acres or more shall be platted in an orientation to maximize solar exposure.
For building-mounted solar energy systems, the