El Paso Electric Company - Net Metering
El Paso Electric (EPE) has offered net metering to customer-generators since September 2011.
Eligibility and Availability
To qualify, distributed renewable generation (DRG) owners must either:
- interconnect an apartment house occupied by low-income elderly tenants that qualifies for master metering, where the DRG is expected to generate at least 50% of the building's annual electricity use or
- have a qualifying facility with a design capacity of not more than 50 kilowatts (kW).
Additionally, the DRG facility must be rated to produce an amount of electricity less than or equal to the estimated annual electricity consumption (for new apartment house or qualifying
- Read more about El Paso Electric Company - Net Metering