Energy Conservation in Public Buildings
In June 2008, Florida enacted legislation (HB 7135) mandating that buildings constructed
- Read more about Energy Conservation in Public Buildings
- Log in or register to post comments
This program was repealed by Act 90 of 2019 and will expire for tax years beginning after December 31, 2031.
Note: Public Act 38 of 2011 repealed the Michigan Business Tax (MBT) and implemented the Corporate Income Tax (CIT). Public Act 39 was passed in conjunction with the CIT and allows for certain credits awarded under the MBT to be retained for the duration of the agreements. Businesses receiving certain credits, including Renaissance Zone credits, may choose to either continue to file under the MBT to continue claiming their credits, or file under the CIT. Certain Renaissance Zone credits will
Arizona has energy requirements for state buildings contained within their statutes. A.R.S. § 34-451 requires the Department of Administration, the Department of Transportation, and the Arizona Board of Regents to reduce their energy use by 15% by July 1, 2011 using July 1, 2001 through June 30, 2002 as the baseline year. As a whole, the three building systems reduced their energy usage on a BTU per square foot basis by 15.8% by July 2011, meeting the requirements of the statute.
The statute also requires all departments to purchase products certified by Energy Star or the Federal Energy Management Program
Florida has licensing requirements for all solar contractors. State licensure for such contractors is required by those who install, alter, repair, maintain, relocate, or replace a solar thermal or solar photovoltaic system. Those employed by a licensed contractor are not required to be licensed. Plumbing contractors are also allowed to provide services related to installing, maintaining, repairing, and altering solar heating water systems. Such contractors can do so without obtaining additional local regulatory licenses, certificates, or registrations.
To qualify for a license, installers must have four years of experience, which may include both installation and education and one year must
Wisconsin has several laws that protect a resident's right to install and operate a solar or wind energy system. These laws cover zoning restrictions by local governments, private land use restrictions, and system owner rights to unobstructed access to resources. Wisconsin permitting rules and model policy for small wind can be found here. The state's original laws, enacted in 1982, have subsequently been amended and expanded numerous times.
Limitations on local zoning restrictions
First, Wis. Stat. § 60.61 specifically authorizes towns to enact zoning ordinances to provide “adequate access to sunlight for solar collectors and to wind for wind
Utah's solar easement provision is similar to easement provisions in many other states. Parties may voluntarily enter into written solar easement contracts that are enforceable by law. An easement must be created in writing and filed, duly recorded, and indexed in the office of the recorder of the county in which the easement is granted. A solar easement, once created, runs with the land and does not terminate unless specified by conditions of the easement.
Any deed, will or other instrument that creates a solar easement must include:
New York's real property laws allow for the creation of solar easements. Like those in many other states, these are voluntary contracts which must be entered into in order to ensure uninterrupted solar access for solar energy devices. Solar easement agreements are required at a minimum to contain information describing the easement location and orientation to real property subject to the easement, provisions for termination, and provisions for compensation in the event that interference occurs.
The New York General City, Town, and Village codes also allow local zoning districts to make regulations regarding solar access that provide for "the accommodation
Certification of Photovoltaic Equipment
PREPA specifies that PV equipment must meet UL 1703 requirements, and International Electrotechnical Commission (IEC) standards, as certified by a Nationally Recognized Test Lab. The manufacturer must guarantee that the equipment will be operating at minimum 80% capacity after 20 years. The EAA provides additional technical requirements for inverters and batteries.
Certification of Equipment for Generating Wind Energy
EAA specifies that a wind turbine must meet IEC standards including 61400-1, and if it is inverter integrated 61400-2, 61400-11 and UL Std. 1741. In addition, the manufacturer’s data sheet and a minimum 5-year warranty letter are required.