Interconnection Standards
In November 2005, the Indiana Utility Regulatory Commission (IURC) approved rules governing the interconnection of distributed generation (DG). Indiana's interconnection rules require the state's investor-owned utilities to provide three levels of interconnection to customer-generators.
- Level 1: Applies to inverter-based systems with a maximum nameplate capacity of 10 kilowatts (kW). These systems must comply with IEEE 1547 and UL 1741 standards. There are no application fees or other fees for Level 1 interconnection review. Utilities may not impose additional requirements not specified in the IURC rules. There are specific limitations on a single system's potential impact and the aggregate potential impact