Guam has close to no domestic fuel of its own, so almost every kilowatt-hour starts as a shipped-in fossil fuel. That single fact drives both the island's high electricity costs and the unusually ambitious targets its legislature has set. Guam's original renewable portfolio standard, created by Public Law 29-62, climbed gently: 5 percent of the Guam Power Authority's net electricity sales by 2015, 8 percent by 2020, 10 percent by 2025, 15 percent by 2030 and 25 percent by 2035. In 2019 the legislature replaced that trajectory. Public Law 35-46, amending section 8311 of Article 3, Chapter 8, Title 12 of the Guam Code Annotated, raised the goal to 50 percent of net electricity sales by 2035 and 100 percent by 2045 — see our renewable energy portfolio goal page for the detail.
The utility-scale build-out has started. Guam now has two utility-scale solar photovoltaic facilities totaling about 85 MW. The first of them, the 26 MW Dandan solar farm, came online in 2015 with more than 120,000 panels and produces roughly enough electricity for 10,000 homes. GPA's integrated resource planning is benchmarked to 2035 and the 50 percent milestone, which means the demand for distributed generation on homes and businesses is likely to keep rising rather than level off.
For a homeowner, the incentives are mostly structural rather than cash. Net metering through the Guam Power Authority is the main mechanism for valuing what your array sends back to the grid. Guam also offers a photovoltaic property tax exemption, so adding an array does not raise your assessment, and it has pulled solar into its construction rules through a solar-ready residential building requirement and the island's building energy code.
One honest caution on net metering. Published descriptions of Guam's eligibility limits disagree with each other: different sources variously report a per-system cap in the tens of kilowatts for residential customers and a program-wide ceiling expressed as a share of island peak demand, and a bill to raise that ceiling has been introduced more than once without becoming law. Because the binding figure is whichever one GPA is applying when your application lands, confirm the current cap and queue position with the Guam Power Authority directly before you buy equipment. Note too that the 30 percent federal residential clean energy credit under Section 25D was terminated for expenditures made after 31 December 2025, so it is no longer available to offset a new installation — see our federal credit page and the other federal programs.
Statutory targets, the 85 MW figure and the Dandan details verified 21 November 2026 against the 2023 Guam Strategic Energy Action Plan published by the Guam Energy Office, which cites Public Law 35-46 directly.